Fire-Rated Door
Installation & Replacement
From single openings to full building programs — we manufacture, supply, and install code-compliant fire-rated doors in-house. UL-labeled, NFPA 80 compliant, and FDNY-ready. No middlemen. No delays.
✓ Licensed & Insured ✓ SDI Registered ✓ FDNY Compliant ✓ MBE Certified







🎉 Limited Time — 10% Off All New Fire-Rated Door Installations This Month — Claim your discount ›
Why Choose Universal Fireproof Door
The Only NYC Door Company That Manufactures AND Installs
Most commercial door companies in NYC are distributors. They order doors from factories upstate or out of state, wait 2–3 weeks, then send a subcontracted crew. We are different: we are the factory. Our Brooklyn facility has been manufacturing fire-rated steel doors since 1924 — your door is built in-house and on your site in days, not weeks.
🆕 Monthly Special — Limited Time
Volume Discounts on Multi-Door Projects
Replacing 5+ doors? Ask about volume pricing on hollow metal, fire-rated, and stairwell programs.
Or call (718) 455-8442 to ask about current promotions
Free Estimate — 10% Off This Month
Request Your Free On-Site Estimate
We work with your budget and respond within 2 hours. No obligation, no pressure.
Why Choose UFD
We Do It All — A to Z. No Subcontractors.
Most companies outsource manufacturing or installation. We do both in-house — lower cost, faster turnaround, and full accountability.
We Work With Your Budget
We discuss costs openly and can phase projects to fit your financial timeline — prioritizing urgent doors first.
Brooklyn Factory → Your Building
Doors built at 1171 Myrtle Ave, installed by the same crew. No middlemen, no subcontractors.
3–5 Day Turnaround
Custom fire-rated doors in days. Expedited available for violations and emergencies.
FDNY & NFPA 80 Compliant
HPD/FDNY violations handled end-to-end including paperwork and sign-off.
How It Works
From First Call to Final Sign-Off
No subcontractors. No hand-offs. One company, A to Z.
Free Assessment
We visit your building, measure every opening, and review your budget and code requirements — at no cost.
Custom Manufacturing
Doors fabricated in our Brooklyn factory to exact specs. Fire-rated steel, correct sizing, hardware included. 3–5 days.
Installation
The same crew that built your doors installs them. We minimize tenant disruption and secure openings daily.
Code Sign-Off
All compliance docs, HPD/FDNY paperwork handled. We follow up until your building is fully signed off.
Our Work
100 Years of Workmanship
Built in Brooklyn. Installed by our own crew.
Free EstimateGoogle Reviews
What NYC Building Managers Say
We install fire-rated doors every day. 100+ years of service — here’s what property managers think.
★★★★★
“We needed 18 fire-rated doors replaced fast. UFD came same day, manufactured in 4 days, installed and signed off in 10 days total. Unmatched.”
Anthony M.
Property Mgr — Brooklyn
★★★★★
“HPD violations on 3 floors. UFD handled everything — replacement, paperwork, sign-off. Closed in under 2 weeks.”
Sandra R.
Building Owner — Crown Heights
★★★★★
“No subcontractors. The crew that built the doors installed them. Every door fit perfectly first try.”
Marcus T.
Super — 8-Story, Harlem
★★★★★
“Tight budget. UFD phased the project — urgent floors first, rest the following month. Nobody else offered that.”
Diana L.
Portfolio Mgr — Queens
★★★★★
“Called 9pm, someone on-site 7am, door replaced by noon. Emergency response like that is rare.”
James W.
Ops Director — Bronx
★★★★★
“First FDNY inspection after install — passed with zero deficiencies. UFD is the only vendor we use now.”
Patricia K.
Building Owner — Flatbush
Get In Touch
Reach Us Directly
We respond to all fire-rated door requests the same day during business hours.
Business Hours
Where We Work
Serving All 5 NYC Boroughs & Beyond
From Manhattan high-rises to Brooklyn apartment buildings — we’ve got you covered.
Our Locations
Two Locations to Serve You
Brooklyn manufacturer & Long Island service hub — covering all of NYC and surrounding areas.
1171 Myrtle Ave
Brooklyn, New York 11206
75 Emjay Blvd
Brentwood, New York 11717
FAQ
Common Questions
Everything you need to know about fire-rated door installation and replacement from UFD.
Still have questions?Which doors are required to be fire-rated in NYC? +
Under the NYC Building Code and NFPA 80, stairwell doors, apartment entry doors, boiler/mechanical room doors, and exit doors in multi-unit and commercial buildings must be fire-rated. UFD installs fully UL-labeled, compliant doors and provides all documentation.
What makes UFD more affordable than other contractors? +
Because we manufacture and install ourselves, you pay no subcontractor markups. We also offer phased projects — prioritizing urgent doors first so you can spread costs over time if needed.
How long does replacement take? +
Standard lead time is 3–5 business days from order to installation. Expedited options available for violation deadlines.
Can you work in occupied buildings? +
Yes — we stage work floor by floor, coordinate around tenant schedules, and secure every opening at end of each day. Occupied-building projects are standard for us.
Do you handle HPD and FDNY violations? +
Yes. We handle the full violation lifecycle — replace the door, submit paperwork, and follow up until dismissed.
What does the 10% off cover? +
The 10% discount applies to all new fire-rated door installation projects contracted this month — stairwell, entry, boiler room, and exit doors. Fill out the form or call to lock in your rate.
🎉 10% Off New Projects This Month
Get Code-Compliant
Fire-Rated Doors in NYC
Same-day estimates. UL-labeled doors manufactured in Brooklyn. Installed by our own crew.




